Free · Preset for #57 stone

Crushed Stone Calculator

Quantities in cubic yards and tons for any grade, preset to 4 inches of #57. The sizes below matter more than the arithmetic, because the wrong grade in the wrong layer is what ruins a driveway.

Your measurements

Area shape

4–6" compacted base · 2–3" surface course

USD

Crushed stone runs about $25 to $55 per ton.

Which size do I need? ↓

Material condition

Wet material weighs about 8% more.

10%

10% for open graded stone. Use 20–25% for crusher run, which loses volume as it compacts.

Every grade, with its density Compaction allowance built in

How much crushed stone do I need?

Area in square feet, times depth in feet, divided by 27 for cubic yards. Multiply by 1.40 for US tons of #57 stone, or 1.35 for dense graded crusher run.

A 20 by 12 ft driveway at 4 inches is 80 cubic feet, 88 once you add 10 percent, which is 3.26 cubic yards or 4.58 tons. If that 4 inches is a compacted base rather than a surface, order 20 to 25 percent instead of 10.

At the densities this site publishes
Materiallb per ft³US tons per yd³Covers at 4 in, per ton
Crushed stone #571041.4058 sq ft
Crushed stone #411, crusher run1001.3560 sq ft
Stone dust, screenings1041.4058 sq ft

Crushed stone sizes, and what each one is for

The numbers are ASTM D448 grading designations, not diameters. They describe what passes through each sieve, which is why two stones of similar size behave completely differently.

Common grades at a US landscape supply yard
GradeSizeGradedUse it forNot for
#21.5 to 3 inOpenHeavy drainage, large fill, erosion controlAnything you walk or drive on
#571/2 to 1 inOpenFrench drains, surface course, concrete aggregateBase layers, it will not lock
#673/4 in and downOpenSimilar to #57, slightly finerBase layers
#83/8 to 1/2 inOpenPaver bedding, walkway surfaceDeep base, it migrates
#411, crusher run3/4 in to dustDenseCompacted base under driveways and patiosDrainage, the fines block it
Stone dust, screenings1/4 in and downDensePaver setting bed, leveling courseAny structural depth on its own

Open graded means the fines are screened out, so water runs straight through and the stones never lock together. Dense graded means everything from the top size down to dust is present, so it compacts almost solid. That single distinction decides every choice below.

Why #57 is not a base material

#57 is the stone most people buy for a driveway, and for the base layer it is the wrong one. It is open graded with roughly 36 to 42 percent voids and no fines to fill them, so no amount of rolling turns it into a load bearing layer. It shifts under tires and the surface ruts.

It is excellent at the job it is built for. Water passes through it freely, which is why French drains, downspout trenches and surface courses all use it.

A driveway wants both, in layers.

A driveway that holds up
LayerMaterialDepthWhy
SubgradeNative soil, graded and compactedSloped to drainEverything above fails if water sits here
SeparationWoven geotextileOne layerStops the base punching into soft soil
BaseCrusher run or #4114 to 6 in compactedThe fines lock it into a solid slab
Surface#57 or pea gravel2 to 3 inDrains, and is what you see

The driveway guide covers the full build, and the fabric guide explains what the separation layer does and does not do.

How much extra to order for compaction

Dense graded stone loses volume when it is rolled. Published figures put crusher run at roughly 85 to 95 percent of its loose volume once compacted, against about 70 to 80 percent for #57, which has nothing to fill its voids with.

In practice that means ordering 20 to 25 percent more than the finished dimensions suggest for a compacted base, and about 10 percent for an open graded surface course where settling is minor.

Put another way, 4 inches of finished compacted base needs roughly 5 inches of loose material spread before rolling.

Order in one go

Running short on a base layer is worse than running short on a surface. A second delivery means a second delivery fee and a seam where the two pours meet, which is exactly where ruts start.

How far a ton goes

Area covered by one US ton, before compaction
Depth#57 stoneCrusher runTypical use
2 in115 sq ft120 sq ftSurface course, thin
3 in77 sq ft80 sq ftSurface course
4 in58 sq ft60 sq ftBase, light use
6 in38 sq ft40 sq ftBase, heavy use

Those figures are loose volume. After compaction a dense graded base covers roughly a fifth less ground, which is the same 20 to 25 percent allowance seen from the other direction. The yards to tons converter handles any material and either direction.

Crushed stone or pea gravel

The practical differences
Crushed stonePea gravel
ShapeAngular, fractured facesRounded, water worn
Locks togetherYes, especially dense gradedNo
Comfortable underfootLess so, edges are sharpYes
Holds on a slopeYesNo, above about 5 percent it migrates
Price per ton$25 to $55$30 to $55
Best useBases, driveways, drainagePaths, patios, play areas

They are not really competitors. Most projects want both: angular stone underneath doing the structural work, rounded stone on top if people will walk on it. The pea gravel calculator covers the surface half, and slopes are where the difference becomes decisive.

Crushed stone FAQ

Multiply the area in square feet by the depth in feet, divide by 27 for cubic yards, then multiply by about 1.40 for US tons of #57 stone. A 20 by 12 ft driveway at 4 inches works out to roughly 3.26 cubic yards or 4.58 tons with a 10 percent allowance included.

About 2,808 pounds, or 1.40 US tons, for #57 stone at 104 pounds per cubic foot. Dense graded crusher run and #411 run closer to 2,700 pounds, or 1.35 tons, and stone dust is about the same as #57.

Two sizes, layered. Use 4 to 6 inches of dense graded crusher run or #411 as the base, because the fines let it lock together, then 2 to 3 inches of #57 on top for the surface. One size alone gives you either a surface that will not drain or a base that will not hold.

No, and this is the most expensive mistake on this page. #57 is open graded with roughly 36 to 42 percent voids and no fines, so it cannot compact into a load bearing layer. It drains superbly, which is why it belongs in French drains and as a surface course, but a driveway built on it will rut.

Grading. #57 is a single size around 1/2 to 1 inch with the fines screened out, so water passes straight through. Crusher run, also sold as #411, quarry process or dense graded aggregate, runs from about 3/4 inch down to dust, and the dust fills the gaps so it compacts almost solid.

About 20 to 25 percent for dense graded material like crusher run, because it loses volume as it is rolled. Open graded stone such as #57 settles far less, so 10 percent is usually enough. The calculator's waste slider covers both.

About 115 square feet at 2 inches deep, 77 at 3 inches and 58 at 4 inches, for #57 stone. Dense graded material covers slightly more per ton before compaction and slightly less after it.

Roughly $25 to $55 per US ton at the yard, before delivery, which makes it the cheapest of the common landscaping stones. Crusher run usually sits at the lower end and washed single sizes at the higher end.

Sources and methodology

  1. Densities. #57 at 104 lb/ft³, #411 and crusher run at 100, stone dust at 104, all loose and dry. Published in full as open data, with background from USGS Mineral Commodity Summaries 2026, Stone (Crushed) (PDF).
  2. Size designations. ASTM D448 standard sizes, which define grading by sieve rather than by nominal diameter. Yard names such as crusher run, quarry process and dense graded aggregate are regional labels for the same dense graded material.
  3. Void content, 36 to 42 percent for #57. Typical published range for open graded single size aggregate, and the reason it cannot serve as a structural base.
  4. Compaction, 85 to 95 percent of loose volume for crusher run against 70 to 80 percent for open graded stone. Industry figures, which is why this site recommends a 20 to 25 percent allowance for base layers.
  5. Prices, $25 to $55 per ton. From the ranges in the cost guide, which lists its own sources.

Surfacing with pea gravel?

The main calculator covers the rounded stone that goes on top, with depth and base guidance to match.